Length of time (LOT) data errors are based on data in the Project Start Date and Project Exit Date.
When a client has an Entry/Exit record with a provider where the LOT is greater than the maximum days for that project type, reports will flag this as a data quality error.
- For Emergency Shelter projects (ES) this maximum is 90 days.
- For Transitional Housing projects (TH) this maximum is 730 days.
LOT errors:
- This may or may not be a data entry error. Check the following things:
- Confirm that the Project Start and Project Exit Dates are correct for each client. If incorrect, update to the the information with the exact entry/exit dates.
- If an Exit Date is missing, ensure the client should be exited and, if so, add the exact Exit Date for the client.
- If the Project Start and Project End Dates are correct, there is no need for further action.